|
Issue |
Title |
|
Vol 7, No 2 (2023): JTS TEKNOLOGI SIPIL |
Kinerja Ruas Jalan Perkotaan di Jalan Ir. H. Juanda di Kota Samarinda Kalimantan Timur |
Abstract
PDF
|
Triana Sharly P. Arifin, Mardewi Jamal, Muhammad Sulthan Fajar |
|
Vol 8, No 2 (2024): JTS TEKNOLOGI SIPIL |
KOMPARASI PERENCANAAN JEMBATAN RANGKA BAJA TIPE WARREN DENGAN STANDAR JEMBATAN RANGKA NO. 07/BM/2005 (STUDI KASUS : PADA PROYEK PEMBANGUNAN JEMBATAN PENJALIN TABANG) |
Abstract
PDF
|
Faris Fadillah, Ery Budiman, Mardewi Jamal |
|
Vol 2, No 2 (2018): JTS TEKNOLOGI SIPIL |
KORELASI POROSITAS BETON TERHADAP KUAT TEKAN RATA-RATA |
Abstract
PDF
|
Mufti Amir Sultan |
|
Vol 4, No 1 (2020): JTS TEKNOLOGI SIPIL |
KUAT TEKAN BETON DENGAN MENGGUNAKAN LATERIT SEBAGAI AGREGAT KASAR DAN PASIR MAHAKAM SEBAGAI AGREGAT HALUS |
Abstract
PDF
|
Ridwan Effendi, Budi Haryanto, Fachriza Noor Abdi |
|
Vol 8, No 2 (2024): JTS TEKNOLOGI SIPIL |
Metode Pengendalian Suhu Beton Massa Pekerjaan Pengecoran Pile Cap Jembatan dengan Pengaliran Air Laut Menggunakan Pipa-pipa PVC didalam Beton Studi Kasus : Pengecoran Pile Cap Jembatan Pulau Balang Bentang Pendek |
Abstract
Untitled
PDF
|
Ruminsar ok Simbolon, Heri Sutanto |
|
Vol 1, No 1 (2017): JTS TEKNOLOGI SIPIL |
METODE VACUUM PRELOADING SEBAGAI SALAH SATU ALTERNATIF SOLUSI PEMBANGUNAN TIMBUNAN DI ATAS TANAH LUNAK |
Abstract
PDF
|
Hary Christady Hardiyatmo |
|
Vol 2, No 1 (2018): JTS TEKNOLOGI SIPIL |
MODEL BANGKITAN TRANSPORTASI PADA PERUMAHAN KORPRI KECAMATAN SUNGAI KUNJANG SAMARINDA |
Abstract
PDF
|
Muhammad Jazir Alkas |
|
No 1 (2018): Edisi Khusus JTS Teknologi Sipil |
MODEL PENAHAN SEDIMEN SEKAT BERCINCIN PADA SALURAN IRIGASI |
Abstract
PDF
|
Nenny Nenny |
|
No 1 (2018): Edisi Khusus JTS Teknologi Sipil |
MODEL PENETAPAN PROYEK KONSTRUKSI SISTEM KONTRAKTUAL ATAU BERBASIS PEMBERDAYAAN MASYARAKAT |
Abstract
PDF
|
Isnaini Zulkarnain |
|
Vol 2, No 2 (2018): JTS TEKNOLOGI SIPIL |
NETRALISASI AIR ASAM AREA LAND CLEARING DAN LAND PREPARATION DENGAN MEDIA KAPUR TANAH DI LOKASI BANGUNAN INDUSTRI |
Abstract
PDF
|
Muslim Noor |
|
Vol 4, No 1 (2020): JTS TEKNOLOGI SIPIL |
OPTIMALISASI BIAYA & WAKTU PEKERJAAN PADA SALURAN PELIMPAH (SPILLWAY) DENGAN MENGGUNAKAN METODE LEAST COST ANALYSIS |
Abstract
PDF
|
Rizal Setiawan, Tamrin Rahman, Mardewi Jamal |
|
Vol 4, No 2 (2020): JTS TEKNOLOGI SIPIL |
OPTIMALISASI BIAYA DAN WAKTU PELAKSANAAN PROYEK DENGAN METODE LEAST COST ANALYSIS |
Abstract
PDF
|
Khoni Eka Pratiwi, Fachriza Noor Abdi, Ery Budiman |
|
Vol 3, No 1 (2019): JTS Teknologi Sipil |
OPTIMALISASI BIAYA DAN WAKTU PELAKSANAAN PROYEK PADA PROYEK DENGAN METODE LEAST COST ANALYSIS |
Abstract
PDF
|
Fedrikson Fedrikson, Mardewi Jamal, Fachriza Noor Abdi |
|
Vol 6, No 1 (2022): JTS TEKNOLOGI SIPIL |
OPTIMASI RUTE ANGKUTAN SAMPAH KECAMATAN SUNGAI KUNJANG KOTA SAMARINDA DENGAN METODE PENYELESAIAN VEHICLE ROUTING PROBLEM (VRP) |
Abstract
PDF
|
Deti Saskia Dela Ferdiani, Triana Sharly P. Arifin, Masayu Widiastuti |
|
Vol 1, No 2 (2017): JTS TEKNOLOGI SIPIL |
PEMAKAIAN AGREGAT PALU PADA CAMPURAN BERASPAL ASPHALT TREATED BASE |
Abstract
PDF
|
Triana Sharly Permaisuri Arifin |
|
76 - 90 of 145 Items |
<< < 1 2 3 4 5 6 7 8 9 10 > >> |