| Issue | Title | |
| Vol 8, No 1 (2024): JTS TEKNOLOGI SIPIL | ANALISIS PELAT BERLUBANG DENGAN APLIKASI METODE ELEMEN HINGGA EAoSM DAN SAP 2000 (SHELL MULTILAYERED MESH ELEMENTS) | Abstract PDF |
| Tukbagus Rahmat Wijaya, Fachriza Noor Abdi, Budi Haryanto | ||
| Vol 6, No 2 (2022): JTS TEKNOLOGI SIPIL | ANALISIS PENGARUH FLUKTUASI MUKA AIR TANAH TERHADAP STABILITAS LERENG TIMBUNAN DI ATAS TANAH LUNAK PADA BANDARA APT. PRANOTO, KOTA SAMARINDA | Abstract PDF |
| Donni Damara, Tamrin Rahman, Heri Sutanto | ||
| Vol 2, No 1 (2018): JTS TEKNOLOGI SIPIL | ANALISIS PENGARUH PENAMBAHAN PASIR PALU SEBAGAI BAHAN STABILISASI MEKANIS PADA PERILAKU TANAH LEMPUNG | Abstract PDF |
| andi marini indriani | ||
| Vol 9, No 2 (2025): JTS TEKNOLOGI SIPIL | Analisis Pengaruh Penggunaan Fly Ash Untuk Stabilisasi Tanah Dasar | Abstract PDF |
| Muhammad Jazir Alkas, Tiopan Henry M Gultom, Muhammad Sopian | ||
| Vol 2, No 2 (2018): JTS TEKNOLOGI SIPIL | ANALISIS PENGARUH PENGGUNAAN GEOTEKSTIL TERHADAP PENINGKATAN DAYA DUKUNG FONDASI DANGKAL PADA TANAH LEMPUNG DI KOTA SAMARINDA | Abstract PDF |
| Agmi Dimas Isbusandi | ||
| Vol 7, No 2 (2023): JTS TEKNOLOGI SIPIL | Analisis Pengaruh Perilaku Masyarakat Terhadap Kualitas Air Baku dan Air Minum PDAM Tirta Handayani Gunung Kidul | Abstract PDF |
| Frederik K Tandi, Budi Kamulyan, Fatchan Nurrochmad | ||
| Vol 4, No 1 (2020): JTS TEKNOLOGI SIPIL | ANALISIS PENGENDALIAN BIAYA DAN WAKTU TERHADAP PROYEK KONSTRUKSI DENGAN METODE EARNED VALUE (STUDI KASUS: PROYEK PERUMAHAN PENAJAM PASER UTARA) | Abstract PDF |
| Nur Khairunnisa, Rusfina Widayati, Mardewi Jamal | ||
| Vol 7, No 2 (2023): JTS TEKNOLOGI SIPIL | ANALISIS PENGGUNAAN MATERIAL TANAH DAN MATERIAL PASIR LAUT PADA BEBAN PRELOADING TERHADAP WAKTU PELAKSANAAN DAN BIAYA | Abstract PDF |
| Muhmmad Alfhat, Masayu Widiastuti, Mardewi Jamal | ||
| No 1 (2018): Edisi Khusus JTS Teknologi Sipil | ANALISIS PENGURANGAN TIE-BEAM SEBAGAI OPTIMALISASI WAKTU PELAKSANAAN PEKERJAAN STRUKTUR PROYEK TERMINAL BANDARA SEPINGGAN BALIKPAPAN | Abstract PDF |
| Agus Sugianto | ||
| Vol 4, No 1 (2020): JTS TEKNOLOGI SIPIL | ANALISIS PENURUNAN KONSOLIDASI METODE PRELOADING DAN PREFABRICATED VERTICAL DRAIN (PVD) | Abstract PDF |
| Heny Susiazti, Masayu Widiastuti, Rusfina Widayati | ||
| Vol 6, No 2 (2022): JTS TEKNOLOGI SIPIL | ANALISIS PERBANDINGAN TEBAL LAPIS PERKERASAN KAKU DENGAN TEBAL LAPIS PERKERASAN LENTUR TERHADAP EFISIENSI BIAYA (STUDIKASUS : JALAN PAMPANG MUARA PADA STA 4+000 S/D STA 6+215) | Abstract PDF |
| Prameswari Widya Ningtyas, Heri Sutanto, Triana Sharly P. Arifin | ||
| Vol 3, No 2 (2019): JTS Teknologi Sipil | ANALISIS PERCEPATAN WAKTU DENGAN MENGGUNAKAN METODE TIME COST TRADE OFF PADA PROYEK PEMBANGUNAN RUSUN 1 KOTA SAMARINDA KALIMANTAN TIMUR | Abstract PDF |
| Muhammad Fazri, Masayu Widiastuti, Mardewi Jamal | ||
| Vol 6, No 2 (2022): JTS TEKNOLOGI SIPIL | ANALISIS PERENCANAAN APRON BANDARA MELAK BERDASARKANPROYEKSI 20 TAHUN MENDATANG | Abstract PDF |
| Annisa Rahma Utari, M. Jazir Alkas, Masayu Widiastuti | ||
| Vol 4, No 1 (2020): JTS TEKNOLOGI SIPIL | ANALISIS PERHITUNGAN KAPASITAS RUNWAY PADA BANDAR UDARA INTERNASIONAL AJI PANGERAN TUMENGGUNG PRANOTO SAMARINDA | Abstract PDF |
| Hernasdy Suprianto, Triana Sharly P. Arifin, Budi Haryanto | ||
| Vol 5, No 2 (2021): JTS TEKNOLOGI SIPIL | ANALISIS PERHITUNGAN WAKTU DAN BIAYA ANTARA ATAP BETON KONVENSIONAL DENGAN SANDWICH PANEL PADA PERLUASAN BANDARA PATTIMURA AMBON | Abstract PDF |
| Ma’ruf Syafaat, Mardewi Jamal, Ery Budiman | ||
| 31 - 45 of 164 Items | << < 1 2 3 4 5 6 7 8 9 10 > >> | |





